Page 1 of 1
stop criterion
Posted: Sat Nov 12, 2011 8:08 am
by rasoul
Hi
what is stop criterion:1.0E-4?
Posted: Sat Nov 19, 2011 11:23 pm
by Diogenes
= Sum{Abs[loading_iteration_n – loading_iteration_(n – 1)]}
When the difference between the loadings from one iteration to the next is very low (sum < 0.0001) the algorithm stops and the final results are computed (AVE, CC, …).
Best regards,
Bido
Posted: Sun Nov 20, 2011 5:19 am
by rasoul
thanks a lot