model comparison under the same project
model comparison under the same project
I have a project with one model. I want to modify this model then compare the results from new model and the results from the old one. Can I copy the old model to create a new one under the same project name?
Zhiwu Liang
copying models
How do we go about copying models with relationships and indicators?
I have tried copy and paste and looked at all the tabs but have not been able to do so.
Thank you!
I have tried copy and paste and looked at all the tabs but have not been able to do so.
Thank you!
- Diogenes
- PLS Super-Expert
- Posts: 899
- Joined: Sat Oct 15, 2005 5:13 pm
- Real name and title:
- Location: São Paulo - BRAZIL
- Contact:
Hi,
1) How to copy the project (model and data)?
Projects / right click in the project name / copy resource / Rename it / OK.
2) How to copy the model (inside of the same project)?
1) Projects / click in the blue icon (model to be copied) / Copy resource / Select the model again / Rename it / Ok.
In this way you will have the same data set with different models to run.
Best regards,
Bido
1) How to copy the project (model and data)?
Projects / right click in the project name / copy resource / Rename it / OK.
2) How to copy the model (inside of the same project)?
1) Projects / click in the blue icon (model to be copied) / Copy resource / Select the model again / Rename it / Ok.
In this way you will have the same data set with different models to run.
Best regards,
Bido
Splitting the model in smaller pieces
Dear Professor Bido,
When I run the complete model, only two of the ten paths are significant. However, when I split the model in smaller pieces I have more paths that are significant.
Is this process correct? Can we assume the paths are significant overall?
When I run the complete model, only two of the ten paths are significant. However, when I split the model in smaller pieces I have more paths that are significant.
Is this process correct? Can we assume the paths are significant overall?
Problem with multiple models within a project
I see your response below and have no trouble creating copies of projects or models but when I copy a model, save All (ie. the project), close PLS, and try to reopen my project, only my most recent model appears and it appears in all of the tabs (the tabs I refer to are the models). Thus, I'm losing all of the other model comparisons that were in the other tabs within the same project. I hope this makes sense and I wonder if I'm just doing something wrong. Thanks.
Diogenes wrote:Hi,
1) How to copy the project (model and data)?
Projects / right click in the project name / copy resource / Rename it / OK.
2) How to copy the model (inside of the same project)?
1) Projects / click in the blue icon (model to be copied) / Copy resource / Select the model again / Rename it / Ok.
In this way you will have the same data set with different models to run.
Best regards,
Bido